PHASE 2 PROJECT PHOTOS – CONSTRUCTION PHOTOS

Installing motorized dampers at the 2nd floor Facing North.jpg Installing sprinkler piping at the 2nd floor Facing South.jpg Installing storm at the High Roof Facing East.jpg Interior Electrical roughing at the 2nd floor Facing North.jpg Stated installing sheathing at the low roof Facing West.jpg Duct work at the 4th floor Facing East.jpg Installed storm pipe hangers at the high roof Facing West.jpg Installing ductwork at the 4th floor Facign South.jpg
Previous pageNext page Stated installing sheathing at the low roof Facing West
Stated installing sheathing at the low roof Facing West